본문 바로가기 주메뉴 바로가기

Working Sequence

Home > Method of Construction > Working Sequence
  • 1.Transport of SP-STRUT

  • 2.Cutter for SP-STRUT

  • 3.Drilling for bolts

  • 4.Bolting jack and jack connector

  • 5.Assembling strut+connector

  • 6.Fixing SP-STRUT on wale

  • 7.Fastening strut and channel with U-band

  • 8.Installing measuring instruments

  • 9.Safety passage

  • 10.Complete